Site icon Geek Alabama

I-20 and I-59 Updates

Advertisements
0
(0)

This post is about updates to the road works on East Alabama Interstates.  The I-59 Etowah County Road work is trying to move along.  At least they are now putting asphalt over the old concrete lanes.

And the southbound I-59 bridge at US 11 is now gone!

Now for the I-20 updates.  The sinkhole detour is now gone and the westbound lanes are back to normal.  And the lanes in the Calhoun County work zone has moved to the newly paved median.  And on the eastbound side at exit 185 there is a contraflow situation set up.

Here is video of the right lane rumble strips on I-20 in the Cleburne County work zone.

[youtube=http://www.youtube.com/watch?v=H0Kq-UILJ5w&list=UU5Ty0fF-58pL80AOJe4NqzQ&index=4&feature=plcp]

Thanks for reading Geek Alabama!  Please rate and share our posts!

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Exit mobile version